Inside Cape Fear Public Utility Authority’s service area, hooking a new single-family home to public water and sewer costs about $11,400 in authority fees: $2,270 and $3,465 in water and sewer system development charges, plus a $2,463 water service connection, a $2,928 sewer service connection and a $315 meter set (CFPUA Rates and Fees Schedule FY 26-27, effective July 1, 2026). If you are buying a finished home from a production builder you will almost never write that check, because it is already inside the price.
The reason this question comes up at all is that buyers hear the phrase “tap fee” from three different people meaning three different things: the system development charge, which buys your share of plant capacity; the service connection fee, which pays for the pipe from the main to your lot; and the meter set. They are separate line items on the utility’s schedule and they add up to real money.
Where it matters most is on a lot purchase or a custom build, because then the fees are yours, and on a Brunswick County lot, where the live question in late 2026 is not what the fee costs but whether the connection is available at all.
The CFPUA numbers, line by line
CFPUA serves Wilmington and much of New Hanover County. Its fee schedule is rebuilt every July 1, and the current one took effect July 1, 2026. A standard single-family home takes a 5/8 inch meter.
- Water system development charge, 5/8 inch meter: $2,270 CFPUA Rates and Fees Schedule FY 26-27, effective 7/1/2026
- Sewer system development charge, 5/8 inch meter: $3,465 CFPUA Rates and Fees Schedule FY 26-27
- Water service line connection fee, 1 inch service: $2,463 CFPUA Rates and Fees Schedule FY 26-27
- Sewer service installation fee, 4 inch service: $2,928 CFPUA Rates and Fees Schedule FY 26-27
- Meter set fee, 5/8 inch: $315 CFPUA Rates and Fees Schedule FY 26-27
- Step up to a 1 inch meter and the two system development charges alone jump to $5,675 and $8,663 CFPUA Rates and Fees Schedule FY 26-27
One detail worth knowing before an architect talks you into a bigger meter. CFPUA’s schedule lists a separate line for a 1 inch meter on a single-family home with a fire sprinkler system, and it charges that home the 5/8 inch rates, $2,270 and $3,465, rather than the 1 inch rates. So a sprinklered house is not penalized for the larger meter the sprinkler system requires. A larger meter for any other reason is.
Who actually pays this depends on how you are buying
If you are buying a home that a builder is building on a builder-owned lot in a platted community, the builder pulls the permits and pays the utility. The fees are inside your purchase price, the same way the lot and the framing are. You will not see them itemized, and asking the sales agent to break them out will not get you anywhere, because the builder prices the house, not the parts.
If you bought a lot and hired someone to build on it, or you are buying a lot in a community where the buyer contracts separately for the home, the fees are yours and they are due at permitting. Budget them as cash, early, alongside the building permit and the driveway. We walk buyers through the whole sequence in our new construction guide, and the current incentives at each builder we represent often include closing cost credits that can absorb some of this.
Either way, ask one question in writing: is the home or lot already served by public water and sewer, or does the connection still need to be extended? An extension is a different and much larger number than a tap fee, and it is the single most common surprise we see on rural lots in Pender and inland Brunswick.
Across the bridge the math changes
Brunswick County does not charge by meter size. Its wastewater fee schedule sets residential sewer capital recovery at $1,956 per bedroom plus a sewer transmission capital recovery charge of $252 per bedroom (Brunswick County wastewater fee schedule, FY 2025-26). On a four-bedroom house that is $8,832 for sewer alone, which is why bedroom count on a Brunswick plan is a cost decision and not just a design one.
In Leland and Belville, much of the service area belongs to Brunswick Regional Water and Sewer H2GO rather than the county. H2GO’s FY 2025-26 schedule, effective July 1, 2025, set its water system development fee at $5,600 per equivalent dwelling unit and sewer at $6,600 (H2GO FY 2025-26 rate and fee schedule). We could not confirm H2GO’s FY 2026-27 figures or Pender County Utilities’ current schedule from a published document today, so treat those two as numbers to request rather than numbers to plan on.
In Brunswick, the fee is not the real risk right now
There is a bigger story behind these fees, and if you are buying a new build in Brunswick County you need it. The North Carolina Department of Environmental Quality froze new sewer permits in the county at the start of 2026 because its plants exceed the state’s capacity threshold once already approved developments are counted (Port City Daily, October 22, 2026). Under a 2023 state law, a fast-growing county cannot exceed 110% of capacity, or 115% if expansions are underway, and unbuilt but approved developments count as though they were already flowing.
The numbers in that reporting are stark. The Navassa plant in the northeast part of the county has 4.975 million gallons per day of capacity against roughly 6.3 million gallons promised or connected, putting it at 127% of capacity. The western and southern residential allotment sits at 607%. A $173 million Navassa expansion is agreed, split roughly evenly between the county and H2GO, with groundbreaking set for August 2027 and completion expected in 2030. For the west and south, around Supply and Shallotte, commissioners are still choosing between options that run from about $290 million to about $700 million, and only the largest would allow new hookup applications.
What that means for you at a model home in Leland, Bolivia or Shallotte is a specific question to ask: does this lot have an approved sewer allocation already in hand, in writing, or is it waiting on one? The county can still approve a development without being able to obligate the hookup. A lot without allocation is not necessarily a bad buy, but a closing date on one is a guess. We covered the permitting side of this in can builders still get sewer permits in Brunswick County, and the wider county picture is on our Brunswick County market update.
Every figure above has an expiration date. Utility fee schedules in this region are rewritten each July 1, and CFPUA’s current schedule also removed the 15,000 gallon residential sewer cap starting July 1, 2026, which changes what you pay monthly rather than at hookup. We could not verify Pender County Utilities’ current connection fees or H2GO’s FY 2026-27 numbers from a published schedule today, and we will not estimate them for you. Some communities in Brunswick and Pender are served by a private utility rather than a county system, and those have their own fee structure and their own rate history. And if your lot is on well and septic instead, you are in a different conversation entirely: a septic permit from county environmental health, soil evaluation and a system sized to the bedroom count, with repair area set aside. Ask which of the three situations you are in before you sign anything.
Related questions people also ask
Is the tap fee included in a new construction purchase price?
When you buy a completed or to-be-built home from a production builder on the builder’s lot, yes, the utility fees are part of what the builder paid to deliver the house and they are inside the price. When you own the lot and contract separately for construction, the fees are yours and they are generally due when the building permit is pulled. The difference matters for your cash planning, not for the total cost of the house. Ask the builder in writing which arrangement applies before you sign.
Why is the sewer fee higher than the water fee?
Wastewater treatment plants cost substantially more to build and expand than water capacity, and a system development charge is designed to recover a new connection’s share of that cost. That is why the sewer charge runs well above the water charge on nearly every schedule in our region, and why sewer capacity, not water, is the constraint holding up development in Brunswick County right now. It is also why a county may charge sewer by bedroom count while charging water by meter size. The structure follows the cost.
Can I negotiate utility connection fees with the builder?
The fee itself is set by the utility and is not negotiable by anyone, including the builder. What is negotiable is who pays costs that sit around it, and builder closing cost credits or incentive packages can effectively cover part of your cash at closing. If you are buying a lot and building, it is worth asking the builder’s estimate for utility fees in writing early, because an estimate made a year before permitting can be out of date by the time you pay it. Register your agent on your first visit to any model home so you have someone representing you in that conversation.
Before you go under contract on a new build or a lot, get three things in writing: which utility serves the address, whether water and sewer are already available to the lot or still need extending, and for a Brunswick County lot, whether sewer allocation is approved and in hand. Bring the builder’s answers to our team and we will tell you what we are seeing from the same builders on other lots this month.
Sources: Cape Fear Public Utility Authority, Rates and Fees Schedule FY 26-27, rates and fees effective 7/1/2026 (water and sewer system development charges, service connection fees, meter set fees). Brunswick County wastewater fee schedule, FY 2025-26 (residential sewer capital recovery $1,956 per bedroom; sewer transmission capital recovery $252 per bedroom). Brunswick Regional Water and Sewer H2GO, FY 2025-26 rate and fee schedule, effective July 1, 2025. Port City Daily, “Brunswick wastewater expansion to cost hundreds of millions as development outpaces capacity,” October 22, 2026.